Events from October 15, 2020

  • From October 15, 2020 18:30 until October 15, 2020 20:30
    At Categories: Talk
    Synopsis The constructed Matagarup Bridge connects East Perth (western river bank) to the Burswood Peninsula and the new Perth Stadium (eastern river bank). The bridge is approximately 65 m high, 370 m long with a 165 m long cable stayed central span. The bridge is supported on two river piers and two piers on land. A total of forty-eight 1.05 m and 1.2 m diameter close ended steel tube piles were driven to support the piers. This talk presents the geotechnical design and construction considerations of the bridge, with specific focus on the bridge foundation and the temporary causeway constructed to facilitate the successful construction works.
1 133 10-15-2020

Banking Info

Bank name: CIMB BANK BERHAD

Bank Address: MENARA BHL, NO.51, JALAN SULTAN AHMAD SHAH, 10050 PENANG

Bank Account Number: 80-0762026-7

Account Name: The Institution of Engineers, Malaysia